Project

The Cineplexx Group ordered the execution of the complete electrical high and low voltage equipment for 11 cinema auditoriums, SC Ušće in Belgrade.

 

Scope of Works

The investor decided that on a total area of ​​6100 m2 to build a cinema with the latest digital projection technology for images and sound with fully integrated control systems.

 

Key Figures

Surface area:                                            6.100 m2

Cables laid:                                                110 km

Lighting fixtures:                                     1289 pcs

Total energy:                                             650 kW

 

Highlights

On this project it was particularly challenging as all necessary works had to be carried out in less than 3 months.

 

Completion

04/2014 .

Investor

Cineplexx SRB d.o.o.

 

Project

The Cineplexx Group ordered the execution of the complete electrical high and low voltage equipment for 11 cinema auditoriums, SC Ušće in Belgrade.

 

Scope of Works

The investor decided that on a total area of ​​6100 m2 to build a cinema with the latest digital projection technology for images and sound with fully integrated control systems.

 

Key Figures

Surface area:                                            6.100 m2

Cables laid:                                                110 km

Lighting fixtures:                                     1289 pcs

Total energy:                                             650 kW

 

Highlights

On this project it was particularly challenging as all necessary works had to be carried out in less than 3 months.

 

Completion

04/2014 .