“Gamma”, Izvoarele II, Romania 50 MWp

“Gamma”, Izvoarele II, Romania 50 MWp

The Client
LJG Green Source Energy Gamma srl

 

 

 

The Project
LSG Building Solutions GmbH was contractedtorealizethe20/110kV power station incl. transformer and 110kV overhead-line for theproject photovoltaik-powerplant „GAMMA“.

Although differing in size and investment costs, projects Alpha, Beta and Gamma employed largely the same technology. Mounted with Schüco technology, the modules are each fixed at a 25° angle to grant maximum performance yield and minimum shading. Distance between the module rows is 7.5 meters. Cabling was supplied by MeinhartKabel, which was installed underground in a sand bed. SMA supplied its Sunny Central inverters for the project (models CP-720, CP-800 and CP-850 were used), with skytron’s monitoring system employed across all three projects as part of Green Source’s O&M management

 

Scope of Work
Delivery, installation and commissioning of:
20kV-indoor switchgear
110kV- outdoor-switchgear
63MVA Transformer 20/110kV
SCADA-control
Civilworks (buildings, fences, streets, foundations)
Auxiliary installations for Station buildings

 

Key Figures
Name:  Gamma
Voltage niveau:         20 / 110 kV
Total Power Station:   50 MW
Completion:   December 2013
CO2 savings: Approx. 57,000 metric tons per year
Modules used: Mixture of modules from S-Energy and other suppliers
Investment partner: Core Value Capital

The Client
LJG Green Source Energy Gamma srl

 

 

 

The Project
LSG Building Solutions GmbH was contractedtorealizethe20/110kV power station incl. transformer and 110kV overhead-line for theproject photovoltaik-powerplant „GAMMA“.

Although differing in size and investment costs, projects Alpha, Beta and Gamma employed largely the same technology. Mounted with Schüco technology, the modules are each fixed at a 25° angle to grant maximum performance yield and minimum shading. Distance between the module rows is 7.5 meters. Cabling was supplied by MeinhartKabel, which was installed underground in a sand bed. SMA supplied its Sunny Central inverters for the project (models CP-720, CP-800 and CP-850 were used), with skytron’s monitoring system employed across all three projects as part of Green Source’s O&M management

 

Scope of Work
Delivery, installation and commissioning of:
20kV-indoor switchgear
110kV- outdoor-switchgear
63MVA Transformer 20/110kV
SCADA-control
Civilworks (buildings, fences, streets, foundations)
Auxiliary installations for Station buildings

 

Key Figures
Name:  Gamma
Voltage niveau:         20 / 110 kV
Total Power Station:   50 MW
Completion:   December 2013
CO2 savings: Approx. 57,000 metric tons per year
Modules used: Mixture of modules from S-Energy and other suppliers
Investment partner: Core Value Capital

ADVANCED SOLUTIONS FOR A BETTER LIFE!
office.group@lsg-group.eu Tel: +(43) 1 61666520


All rights reserved LSG Group GmbH 2023

All rights reserved LSG Group GmbH 2023