×

#ADVANCEDSOLUTIONSFORABETTERLIFE!  

Helmut Zilk Park

Helmut Zilk Park

Client
Strobl Bau Holzbau GmbH (general contractor)
at home Immobilien & Neue Heimat (investor)

Project
The “Gesundheitsquartier” (building lot C.22.A) developed in the western part of the urban development area called “Sonnwendviertel” in Viennas 10th district. 31 privately financed condominium flats from 48 to 126 square meter were built on five floors in the total seven storeys high building. On ground level and the basement commercial areas with conference rooms and leisure areas were constructed.

Scope of Services

Building Services
Heating, Ventilation, AirConditioning, Sanitary
Hydrant systems (dry rising mains)
Pressure Ventilation

Electrical installaions
Energy distribution
High- and Low voltage electrical systems
Fire alarm system
Escape route lighting
Lightning Protection System

Key Figures
Construction period: November 2017 – February 2019

Highlights
Healthy living embedded in green environment was in focus for the building in the Maria-Lassnig-Street 36:

Wood was an important component in the CO2-binding hybrid contruction technology of the building. The facade is covered with natural wood.

This causes extraordinary mounting conditions for building services and electrical installation. A building with that huge amount of wooden construction brings a challenge for installation, fire prevention and construction. No problem for LSG.

Client
Strobl Bau Holzbau GmbH (general contractor)
at home Immobilien & Neue Heimat (investor)

Project
The “Gesundheitsquartier” (building lot C.22.A) developed in the western part of the urban development area called “Sonnwendviertel” in Viennas 10th district. 31 privately financed condominium flats from 48 to 126 square meter were built on five floors in the total seven storeys high building. On ground level and the basement commercial areas with conference rooms and leisure areas were constructed.

Scope of Services

Building Services
Heating, Ventilation, AirConditioning, Sanitary
Hydrant systems (dry rising mains)
Pressure Ventilation

Electrical installaions
Energy distribution
High- and Low voltage electrical systems
Fire alarm system
Escape route lighting
Lightning Protection System

Key Figures
Construction period: November 2017 – February 2019

Highlights
Healthy living embedded in green environment was in focus for the building in the Maria-Lassnig-Street 36:

Wood was an important component in the CO2-binding hybrid contruction technology of the building. The facade is covered with natural wood.

This causes extraordinary mounting conditions for building services and electrical installation. A building with that huge amount of wooden construction brings a challenge for installation, fire prevention and construction. No problem for LSG.

ADVANCED SOLUTIONS FOR A BETTER LIFE!
office.group@lsg-group.eu Tel: +(43) 1 61666520


All rights reserved LSG Group GmbH 2023

All rights reserved LSG Group GmbH 2023