×

#ADVANCEDSOLUTIONSFORABETTERLIFE!  

Office Building Wiesbaden, Germany

Office Building Wiesbaden, Germany

Client
IMMO Kapitalanlage AG

Project
The building lies in the heart of the school district of Wiesbaden in the German region of Hessen. The aim was to change the looks from a unloving office block to an eye catcher in its surrounding. Additionally to the glass façade and the opening in the ceiling in the foyer to an atrium the whole technical infrastructure inside was equipped with the most modern technology. The division into modern rentable sections was made possible by the use of a flexible electro technical infrastructure.

Scope of Services
LJG was contracted to do all the electrical systems, the low current systems and the security systems. The contract comprises the design, the execution and the operating of all the systems.

Key Figures
Gross floor area:                  5.600 m² (4.000 m² offices + general public area)
Electrical wiring works:           350 kVA
Date of completion:              December 2012

Highlights
Besides the challenges concerning architecture and statics, the electrical systems were significantly influenced by the remaining infrastructure. The area to be rented out was to be used in its best possible way concerning flexibility, separation and combination of space. Appropriate attention was given to prohibition of  access and security systems.

 

Client
IMMO Kapitalanlage AG

Project
The building lies in the heart of the school district of Wiesbaden in the German region of Hessen. The aim was to change the looks from a unloving office block to an eye catcher in its surrounding. Additionally to the glass façade and the opening in the ceiling in the foyer to an atrium the whole technical infrastructure inside was equipped with the most modern technology. The division into modern rentable sections was made possible by the use of a flexible electro technical infrastructure.

Scope of Services
LJG was contracted to do all the electrical systems, the low current systems and the security systems. The contract comprises the design, the execution and the operating of all the systems.

Key Figures
Gross floor area:                  5.600 m² (4.000 m² offices + general public area)
Electrical wiring works:           350 kVA
Date of completion:              December 2012

Highlights
Besides the challenges concerning architecture and statics, the electrical systems were significantly influenced by the remaining infrastructure. The area to be rented out was to be used in its best possible way concerning flexibility, separation and combination of space. Appropriate attention was given to prohibition of  access and security systems.

 

ADVANCED SOLUTIONS FOR A BETTER LIFE!
office.group@lsg-group.eu Tel: +(43) 1 61666520


All rights reserved LSG Group GmbH 2023

All rights reserved LSG Group GmbH 2023