Free range system with 185,12 kWp.
On the grounds of the wastewater treatment plant of Mödling, opposite the SCS, a photovoltaic – modules realized outdoor facility with a total 712 polycrystalline PV.
Scope of Work LSG Solar Solutions GmbH
General contractor on behalf of the Wien Energie GmbH
Installation, erection and commissioning of:
photovoltaic under construction (outdoor) incl. PV modules
inverter systems (33kW stations)
AC distribution facilities incl. measuring wall systems
fence and gate systems
monitoring of the system over the Internet
The annual yield is 205.000 kWh.
This is sufficient to supply approximately 60 single-family homes with electricity.
We thank the LSG Building Solutions GmbH for the electro-technical support.