×

#ADVANCEDSOLUTIONSFORABETTERLIFE!  

Fix-Tilt Altnagelberg, Waldviertel

Fix-Tilt Altnagelberg, Waldviertel

Project: Fix-Tilt Altnagelberg
Power: 1.2 MW
Location: im Waldviertel
Country:
Austria
Scope of Service: EPC-Contractor
Period: August 2022 – Dec 2022

Project: Fix-Tilt Altnagelberg
Power: 1.2 MW
Location: im Waldviertel
Country:
Austria
Scope of Service: EPC-Contractor
Period: August 2022 – Dec 2022

ADVANCED SOLUTIONS FOR A BETTER LIFE!
office.group@lsg-group.eu Tel: +(43) 1 61666520


All rights reserved LSG Group GmbH 2023

All rights reserved LSG Group GmbH 2023