PV Chinchilla Australia

PV Chinchilla Australia

The Client
Impact Investment Group, Melbourne

Contractor
Gildemeister LSG Solar Australia PTY Ltd

The Project
The project involved a photovoltaic park with an installed capacity of 20MWp DC and 17,5 MVA AC in Chinchilla, Queensland, Australia. The PV System has been equipped with a new generation of a Tracking System East/West to improve the energy output.

Scope of Services

Engineering of the project:
Performance Ratio calculation analysis
Static calculation
Cable loss analysis
Transformer performance calculation
Project planning, incl. drawings

Delivery, Installation Supervision and Commissioning of:
PV Modules
Substructure – Trackersystem
Inverters (centralized)
Substation 0,4 kV / 18 kV
AC and DC cabling, incl. fuses
Barbwire fencing incl. camera system

Operation & Maintenance
Monitoring and Reporting

Key Figures
Name:  Chinchilla
Voltage Level:  0,4 kV / 18 kV
Installed Capacity:  20MWp DC / 17,5MVA
Completion:  December 2018
Construction Time:  10 Months
CO2 Savings:  113.887.000 kg / year
Modules:  Polycrystalline Modules
RISEN RSM-72-6-325P
Inverters:  Centralized Invertersystem
SMA ZW 2,5MW
Substructure:  Tracking System East/West

The Client
Impact Investment Group, Melbourne

Contractor
Gildemeister LSG Solar Australia PTY Ltd

The Project
The project involved a photovoltaic park with an installed capacity of 20MWp DC and 17,5 MVA AC in Chinchilla, Queensland, Australia. The PV System has been equipped with a new generation of a Tracking System East/West to improve the energy output.

Scope of Services

Engineering of the project:
Performance Ratio calculation analysis
Static calculation
Cable loss analysis
Transformer performance calculation
Project planning, incl. drawings

Delivery, Installation Supervision and Commissioning of:
PV Modules
Substructure – Trackersystem
Inverters (centralized)
Substation 0,4 kV / 18 kV
AC and DC cabling, incl. fuses
Barbwire fencing incl. camera system

Operation & Maintenance
Monitoring and Reporting

Key Figures
Name:  Chinchilla
Voltage Level:  0,4 kV / 18 kV
Installed Capacity:  20MWp DC / 17,5MVA
Completion:  December 2018
Construction Time:  10 Months
CO2 Savings:  113.887.000 kg / year
Modules:  Polycrystalline Modules
RISEN RSM-72-6-325P
Inverters:  Centralized Invertersystem
SMA ZW 2,5MW
Substructure:  Tracking System East/West