The Client
Gildemeister energy solutions GmbH
Contractor
LSG Building Solutions GmbH Wien
The Project
The project involved a photovoltaic park with an installed capacity of 2,5MWp DC and 1,9 MVA AC in Highbridge United Kingdom.
Scope of Services
Engineering of the project:
Performance Ratio calculation analysis
Static calculation
Cable loss analysis
Project planning, incl. drawings
Installation Supervision and Commissioning of:
PV Modules
Substructure
Inverters (decentralized)
Substation 0,4 kV / 10 kV
AC and DC cabling, incl. fuses
Barbwire fencing incl. camera system
Key Figures
Name: Carver Hey
Voltage Level: 0,4 kV / 10 kV
Installed Capacity: 2,5MWp DC / 1,9 MVA
Completion: April 2017
Construction Time: 2 Months
CO2 Savings: 1.188.000 kg / year
Modules: Polycrystalline Modules
Solarworld P290
Inverters: String Inverters
HUAWEI SUN 2000 36KTL
Substructure: Single-post system