Client
FlyREN Energy
Contractor
Onshore: LSG Building Solutions srl Moldowa
Offshore: Gildemeister Energy Solutions GmbH
Project
The project involved a photovoltaic park with an installed capacity of 1 MWp DC and 0,8 MVA AC in Chișinău Moldova.
Scope of Services
Engineering of the project:
Performance Ratio calculation analysis
Static calculation
Cable loss analysis
Project planning, incl. drawings
Installation Supervision and Commissioning of:
PV Modules
Substructure
Inverters (decentralized)
Substation 0,4 kV / 6 kV
AC and DC cabling, incl. fuses
Barbwire fencing incl. camera system
Key Figures
Name: FlyREN
Voltage Level: 0,4 kV / 10 kV
Installed Capacity: 1 MWp DC / 0,8 MVA
Completion: March 2018
Construction Time: 1 Month
CO2 Savings: 594.380 kg / year
Modules: Polycrystalline Modules P270
Inverters: String Inverters HUAWEI SUN 2000 36KTL
Substructure: Single-post system