PV-Park Plant, Elista

PV-Park Plant, Elista

The Client
Green Source, Energoeffect LLC

Contractor
OOO Gildemeister LSG Solar Rus

The Project
The project involved a photovoltaic park with an installed capacity of 15MWp DC and  13,12MVA AC in Astrachan, Russia. The Project was located in Astrachan, north caspian see, Russia.

Scope of Services

Engineering of the project:
Performance Ratio calculation analysis
Static calculation
Cable loss analysis
Transformer performance calculation
Project planning, incl. drawings

Delivery, Installation Supervision and Commissioning of:
PV Modules
Substructure
Inverters (customized)
Substation 0,4 kV / 10 kV
Transmission Line 10kV
AC and DC cabling, incl. fuses
Barbwire fencing incl. camera system
Operation & Maintenance
Monitoring and Reporting

Key Figures
Name:  Elista
Voltage Level:  0,4 kV / 10 kV
Installed Capacity:  15MWp DC / 13,12MVA
Completion:  February 2019
Construction Time:  4 Months
CO2 Savings:  8.915.000 kg / year
Modules:  Polycrystalline Modules
PSM-60-6-250P
Inverters:  HUAWEI 60KTL M0
Substructure:  Double-post system

The Client
Green Source, Energoeffect LLC

Contractor
OOO Gildemeister LSG Solar Rus

The Project
The project involved a photovoltaic park with an installed capacity of 15MWp DC and  13,12MVA AC in Astrachan, Russia. The Project was located in Astrachan, north caspian see, Russia.

Scope of Services

Engineering of the project:
Performance Ratio calculation analysis
Static calculation
Cable loss analysis
Transformer performance calculation
Project planning, incl. drawings

Delivery, Installation Supervision and Commissioning of:
PV Modules
Substructure
Inverters (customized)
Substation 0,4 kV / 10 kV
Transmission Line 10kV
AC and DC cabling, incl. fuses
Barbwire fencing incl. camera system
Operation & Maintenance
Monitoring and Reporting

Key Figures
Name:  Elista
Voltage Level:  0,4 kV / 10 kV
Installed Capacity:  15MWp DC / 13,12MVA
Completion:  February 2019
Construction Time:  4 Months
CO2 Savings:  8.915.000 kg / year
Modules:  Polycrystalline Modules
PSM-60-6-250P
Inverters:  HUAWEI 60KTL M0
Substructure:  Double-post system

ADVANCED SOLUTIONS FOR A BETTER LIFE!