Client
Green Source GmbH, Solar Generation LLC
Contractor
LLC Gildemeister LSG Solar RUS
Project
Construction of a turnkey PV power plant with an installed capacity of 15MWp located in Transbaikalia /Siberia, Russia.
Performance period
June – October 2019Scope of Services as EPC
Scope of Services as EPC
Energy yield analysis & Performance Ratio calculation
Static calculation
Cable loss analysis
Transformer performance calculation
Project planning, incl. drawings
Procurement, supervision of Installation and commissioning:
PV Modules Helios/Akcome SK6612P-325/330
Substructure Mounting Systems, Sigma II ST
Inverters (customized) WR-Station PV Box
“Energo-D”
Substation 0,4 kV / 10 kV
Transmission Line 10kV
AC and DC cabling, incl. fuses
Barbed wire fence incl. CCTV
Monitoring and Reporting
Key data
Voltage level: 0,4 kV / 10 kV
Installed capacity: 15 MWp
Annual yield: 19 968 MWh/a
Specific yield: 1331 kWh/kWp/a
CO2 savings: 8 915 000 kg /a