Client
Green Source GmbH, Terawatt LLC
Contractor
LLC Gildemeister LSG Solar RUS
Project
Construction of a turnkey PV power plant with an installed capacity of 15MWp located in Burjatia, Siberia, Russia.
Performance period: June – October 2019
Scope of Services as EPC
Energy yield study & Performance Ratio calculation
Static calculation
Cable loss analysis
Transformer performance calculation
Project planning, incl. drawings
Procurement, supervision of Installation and commissioning
PV Modules Hevel HJT 310Wp, 315 Wp
Substructure Mounting Systems, Sigma II ST
Inverters Huawei SUN2000 60kTL
Substation 0,4 kV / 10kV
Transmission Line 10kV
AC and DC cabling, incl. fuses
Barbed wire fence incl. CCTV
Operation & Maintenance
Monitoring and Reporting
Key data
Voltage level: 0,4 kV / 10kV
Installed capacity: 15 MWp
Annual yield: 19 685 MWh/a
Specific yield: 1 312 kWh/kWp/a
CO2 savings: 8 915 000 kg/a