Client
UNO – CTBTO
Contractor
LSG Building Solutions GmbH
Project
Installation of a rooftop PV system on the HQ for the task force at nuclear accidents on the Radionuclide Laboratories site in Seibersdorf.
Performance period: Mai – October 2019
Scope of Services
Energy yield analysis
Performance Ratio calculation
Static calculation
Cable loss analysis
Project planning, incl. drawings
Delivery, installation supervision and commissioning
PV Modules Canadian Solar CS3K 295 Wp
Substructure PMT – EVO 2.0
Inverters SMA Core 1
Substation 0,4 kV
AC and DC cabling, incl. fuses
Key data
Solar panel alignment: east-west
Tilt: 10°
Installed capacity: 172 kWp / 150 kVA
Voltage level: 0,4kV
Annual yield: 175,1 MWh/a
Specific yield: 1 042 kWh/kWp/a
CO2 Savings: 179 508 kg/a