Client
Pongratz Bau Ltd.
Project
These two residential houses were designed as infill buildings to close the empty lot on number 18 and continuously apply the line. Thereby 14 and 13 apartments, garden area and children’s playground were erected. Both blocks are combined by the underground parking area with nearly 640m². The car lift finds place in the front house, accessible from the street view. Constructed of reinforced concrete with integrated sun protection adn galleries, the new facilities provide a strong contrast to the adjacent Gründerzeit structure.
Scope of Services
Electrical installation
Power Supply
High- and Low-voltage systems
HVACR installation
Pressure vetilation
Fire extinguishing system
Key Figures
Construction period: September 2013 – July 2015
Highlights
It has been a real competition to erect a high-grade building in a dwarfish narrow space. Using the outmost limits did fit the constructional extensions as well as the technical systems. Highly effective installations were used to preoccupy the minimal available room.