Project: PALFINGER factory, world leader in the market of cranes and lifting systems
Investor: Infranorm Technologie GmbH, Austria
End user: Palfinger Serbia
Place: Nis, Serbia
• Installation of two air conditioning chambers of 75.000m3/h each – a total of 150.000m3/h
• Filter installation
• Delivery and installation of the ventilation system approx. 15.000 kg
• Delivery and installation of a flange channel with a diameter of 1250 mm, for a pressure of 2500 Pa
Completed: 05/2024