The reconstruction of the shopping center CCO Split, LSG Building Solutions d.o.o. was responsible for the execution of electrical installations, plumbing, heating and cooling, ventilation, LPG and sprinklers. Restaurants that are located within the food court are: Fifty Fifty, Wok Me, Fresh, Mexx, Pasta, McDonalds.

Key Indicators:
Surface area:                                                     1.700 m2
Cables laid:                                                            35 km
Lighting fixtures:                                                 240 pcs
Exhaustcapacity:                                        16.600 m3/h
LPG:                                                                  10.000 l
Sprinkler nozzles:                                               105 pcs

Highlights:
Emphasis should be given to the short construction, only two months, and that the center was open during the duration of the works.

Completion of the works:
06/2015

Investor:
Kaufmann i Hofmann d.o.o.

Project:
Food court in CCO Split, Croatia

Scope of Works:
The reconstruction of the shopping center CCO Split, LSG Building Solutions d.o.o. was responsible for the execution of electrical installations, plumbing, heating and cooling, ventilation, LPG and sprinklers. Restaurants that are located within the food court are: Fifty Fifty, Wok Me, Fresh, Mexx, Pasta, McDonalds.

Key Indicators:
Surface area:                                                     1.700 m2
Cables laid:                                                            35 km
Lighting fixtures:                                                 240 pcs
Exhaustcapacity:                                        16.600 m3/h
LPG:                                                                  10.000 l
Sprinkler nozzles:                                               105 pcs

Highlights:
Emphasis should be given to the short construction, only two months, and that the center was open during the duration of the works.

Completion of the works:
06/2015