Project

The company Amnis Energy d.o.o., a member of the LSG Group GmbH, started the project of photovoltaic power plants on approx. 11,000 m2 of land within the Business Enterprise Zone Barban. The lengthy process of obtaining all the necessary permits and studies came to fruition and the photovoltaic power plant started the test run on the 11th of December 2013 in order to be put into permanent operation on the 13th January 2014.

 

Scope of Works

The scope of works besides performing the installation includes obtaining complete documentation and obtaining all necessary permits and licenses (preliminary and final energy approval, preliminary and final electrical energy approvals, building permits, preliminary and final approval for acquiring the status of eligible producer).

 

Key Figures

Total land area:                                         11.000 m2

Total panel energy:                                        560 kW

Total area of the panels:                               4060 m2

Number of solar panels:                              2688 pcs

Completion:                                          January, 2014.

 

Highlights

It should be noted that this project had difficulties due to the partially rugged terrain and long administrative procedures. Construction of the plant lasted only three months.

 

 

Investor

Amnis Energy d.o.o., a member of LSG Group GmbH, Zagreb, Croatia

 

 

Project

The company Amnis Energy d.o.o., a member of the LSG Group GmbH, started the project of photovoltaic power plants on approx. 11,000 m2 of land within the Business Enterprise Zone Barban. The lengthy process of obtaining all the necessary permits and studies came to fruition and the photovoltaic power plant started the test run on the 11th of December 2013 in order to be put into permanent operation on the 13th January 2014.

 

Scope of Works

The scope of works besides performing the installation includes obtaining complete documentation and obtaining all necessary permits and licenses (preliminary and final energy approval, preliminary and final electrical energy approvals, building permits, preliminary and final approval for acquiring the status of eligible producer).

 

Key Figures

Total land area:                                         11.000 m2

Total panel energy:                                        560 kW

Total area of the panels:                               4060 m2

Number of solar panels:                              2688 pcs

Completion:                                          January, 2014.

 

Highlights

It should be noted that this project had difficulties due to the partially rugged terrain and long administrative procedures. Construction of the plant lasted only three months.

 

 