The Client
VelcomGroup (Mobile Network Operator in Belarus, 100% ownedsubsidiaryofTelekom Austria)

The Project
The projectinvolved a photovoltaic park with an installedcapacityof 22MWp DC and 18,5 MVA AC in Bragin, Belarus. The modulesusedwere255/260 WpPolycrystalline. The constructionsite was located in theformerprotectedzonesurroundingtheChernobylExclusion Zone.

Scope of Services

Engineering of the project:
Performance Ratio calculation analysis
Static calculation
Cable loss analysis
Transformer performance calculation
Project planning, incl. drawings

Delivery, Installation Supervision and Commissioning of:

PV Modules
Substructure
Inverters (decentralized)
Substation 0,4 kV / 20 kV
AC and DC cabling, incl. fuses
Barbwire fencing incl. camera system

Operation & Maintenance
Monitoring and Reporting

Key Figures
Name:  Bragin II
Voltage Level:  0,4 kV / 20 kV / 110 kV
Installed Capacity:  22MWp DC / 18,5MVA
Completion:  August 2016
Construction Time:  4 Months
CO2 Savings:  13.076.361 kg / year
Modules:  Polycrystalline Modules, RISEN RSM-60-6-255P, RISEN RSM-60-6-260P
Inverters:  String Inverters, HUAWEI SUN 2000 33KTL
Substructure:  Single-post system

The Client
VelcomGroup (Mobile Network Operator in Belarus, 100% ownedsubsidiaryofTelekom Austria)

The Project
The projectinvolved a photovoltaic park with an installedcapacityof 22MWp DC and 18,5 MVA AC in Bragin, Belarus. The modulesusedwere255/260 WpPolycrystalline. The constructionsite was located in theformerprotectedzonesurroundingtheChernobylExclusion Zone.

Scope of Services

Engineering of the project:
Performance Ratio calculation analysis
Static calculation
Cable loss analysis
Transformer performance calculation
Project planning, incl. drawings

Delivery, Installation Supervision and Commissioning of:

PV Modules
Substructure
Inverters (decentralized)
Substation 0,4 kV / 20 kV
AC and DC cabling, incl. fuses
Barbwire fencing incl. camera system

Operation & Maintenance
Monitoring and Reporting

Key Figures
Name:  Bragin II
Voltage Level:  0,4 kV / 20 kV / 110 kV
Installed Capacity:  22MWp DC / 18,5MVA
Completion:  August 2016
Construction Time:  4 Months
CO2 Savings:  13.076.361 kg / year
Modules:  Polycrystalline Modules, RISEN RSM-60-6-255P, RISEN RSM-60-6-260P
Inverters:  String Inverters, HUAWEI SUN 2000 33KTL
Substructure:  Single-post system