The Client
VelcomGroup (Mobile Network Operator in Belarus, 100% ownedsubsidiaryofTelekom Austria)
The Project
The projectinvolved a photovoltaic park with an installedcapacityof 22MWp DC and 18,5 MVA AC in Bragin, Belarus. The modulesusedwere255/260 WpPolycrystalline. The constructionsite was located in theformerprotectedzonesurroundingtheChernobylExclusion Zone.
Scope of Services
Engineering of the project:
Performance Ratio calculation analysis
Static calculation
Cable loss analysis
Transformer performance calculation
Project planning, incl. drawings
Delivery, Installation Supervision and Commissioning of:
PV Modules
Substructure
Inverters (decentralized)
Substation 0,4 kV / 20 kV
AC and DC cabling, incl. fuses
Barbwire fencing incl. camera system
Operation & Maintenance
Monitoring and Reporting
Key Figures
Name: Bragin II
Voltage Level: 0,4 kV / 20 kV / 110 kV
Installed Capacity: 22MWp DC / 18,5MVA
Completion: August 2016
Construction Time: 4 Months
CO2 Savings: 13.076.361 kg / year
Modules: Polycrystalline Modules, RISEN RSM-60-6-255P, RISEN RSM-60-6-260P
Inverters: String Inverters, HUAWEI SUN 2000 33KTL
Substructure: Single-post system