PV-Park Sainshand, Mongolia

PV-Park Sainshand, Mongolia

The Client
Desert Solar Power One, United Green London

Contractor
Gildemeister LSG Beteiligungs GmbH, Würzburg

The Project
The Project involved a photovoltaic park with an installed capacity of 30MWp DC and 27,5 MVA AC in Shainshand, Mongolia. The Project was located on the „new silk road“ between China and Europe.

Scope of Services

Engineering of the project:
Performance Ratio calculation analysis
Static calculation
Cable loss analysis
Transformer performance calculation
Project planning, incl. drawings

Delivery, Installation Supervision and Commissioning of:

PV Modules
Substructure
Inverters (centralized)
Substation 0,4 kV / 33 kV
AC and DC cabling, incl. fuses
Barbwire fencing incl. camera system

Operation & Maintenance
Monitoring and Reporting

Key Figures
Name:  Shainshand
Voltage Level:  0,4 kV / 33 kV
Installed Capacity:  30MWp DC / 27,5MVA
Completion:  February 2019
Construction Time:  8 Months
CO2 Savings:  17.831.401 kg / year
Modules:  Polycrystalline Modules, TRINA TSM-60-6-280P
Inverters:  Centralized Invertersystem, SUNGROW ZW 2,75MW
Substructure:  Double-post system

The Client
Desert Solar Power One, United Green London

Contractor
Gildemeister LSG Beteiligungs GmbH, Würzburg

The Project
The Project involved a photovoltaic park with an installed capacity of 30MWp DC and 27,5 MVA AC in Shainshand, Mongolia. The Project was located on the „new silk road“ between China and Europe.

Scope of Services

Engineering of the project:
Performance Ratio calculation analysis
Static calculation
Cable loss analysis
Transformer performance calculation
Project planning, incl. drawings

Delivery, Installation Supervision and Commissioning of:

PV Modules
Substructure
Inverters (centralized)
Substation 0,4 kV / 33 kV
AC and DC cabling, incl. fuses
Barbwire fencing incl. camera system

Operation & Maintenance
Monitoring and Reporting

Key Figures
Name:  Shainshand
Voltage Level:  0,4 kV / 33 kV
Installed Capacity:  30MWp DC / 27,5MVA
Completion:  February 2019
Construction Time:  8 Months
CO2 Savings:  17.831.401 kg / year
Modules:  Polycrystalline Modules, TRINA TSM-60-6-280P
Inverters:  Centralized Invertersystem, SUNGROW ZW 2,75MW
Substructure:  Double-post system