×

#ADVANCEDSOLUTIONSFORABETTERLIFE!  

Sportina

Sportina

Client
Sportina d.o.o.

Project
Already after the first project, Sportina Group has recognized the reliability and the quality of LSG, and has gradually widened their cooperation with us. So, LSG has already constructed almost 20 shops in Zagreb, Split, Osijek and Zadar for the following brands:

Tom Tailor, XYZ, Esprit, Bata, Tally Weijl, Orsay, SiX, Butlers, Yamamay

Scope of Services
The scope of works has been established depending on the project. In most cases, LSG has executed both the mechanical and the electrical works, and in a smaller number of projects only one of these works.
Apart from the execution, LSG has also grown to the partner of Sportina Group for all repair and maintenance services.

Key Figures
Surface area (added up until 04/2011): 5.300 m2
Electrical wiring works: 450 kW
Ventilation capacity: 82.000 m3/h
Cooling capacity: 550 kW

Highlights
In shop construction, short completion terms belong to the everyday job. Especially, in the last days before opening, coordination of construction with decorators was inevitable. Until now, we have managed, together with the employees of Sportina, to keep all the opening dates.

Client
Sportina d.o.o.

Project
Already after the first project, Sportina Group has recognized the reliability and the quality of LSG, and has gradually widened their cooperation with us. So, LSG has already constructed almost 20 shops in Zagreb, Split, Osijek and Zadar for the following brands:

Tom Tailor, XYZ, Esprit, Bata, Tally Weijl, Orsay, SiX, Butlers, Yamamay

Scope of Services
The scope of works has been established depending on the project. In most cases, LSG has executed both the mechanical and the electrical works, and in a smaller number of projects only one of these works.
Apart from the execution, LSG has also grown to the partner of Sportina Group for all repair and maintenance services.

Key Figures
Surface area (added up until 04/2011): 5.300 m2
Electrical wiring works: 450 kW
Ventilation capacity: 82.000 m3/h
Cooling capacity: 550 kW

Highlights
In shop construction, short completion terms belong to the everyday job. Especially, in the last days before opening, coordination of construction with decorators was inevitable. Until now, we have managed, together with the employees of Sportina, to keep all the opening dates.

ADVANCED SOLUTIONS FOR A BETTER LIFE!
office.group@lsg-group.eu Tel: +(43) 1 61666520


All rights reserved LSG Group GmbH 2023

All rights reserved LSG Group GmbH 2023