The BRIDGE I is a building with 2Bs + GF + 10F + Tech Floor, situated on 15, Orhideelor Street, Bucharest.  The total area of the building is 51.000 m2, with a  rentable area of aprox. 36.800 m2. The total value of contracted installations works amounts to EUR 11,5 million.

Scope of Services
The scope of work included design&build for the following types of installations: electrical systems, water supply and sewage, heating, cooling, fire protection system, sprinkler, hydrants, low current systems (CCTV, access control, fire alarm, etc.), building management system, facade lighting as well as external mechanical and electrical installations.

Key Figures
Total area of the object: 51.000 m2
Transformer power: 4.800 kVA
Cable length: > 500.000 m
Smoke detectors: approx. 3.000 pcs
Ventilation capacity: 260.000m3/h
Cooling capacity: 3.600 kW
Heating capacity: 3.200 kW
Pipes installed (all systems) approx. 73.000 ml
Ventilation duct: 22.500 sqm

Highlights
High demands in terms of quality and the tight execution time that included fit-outs for BCR bank and IBM were a major challenge. LSG Romania  realized the project with a professional management team and thus ensured the construction of a new emblematic building that takes its place in a small group of exceptional buildings for Bucharest.

Completion
December, 2017.

Investor / General Contractor
Forte Partners / Bogart

Project
The BRIDGE I is a building with 2Bs + GF + 10F + Tech Floor, situated on 15, Orhideelor Street, Bucharest.  The total area of the building is 51.000 m2, with a  rentable area of aprox. 36.800 m2. The total value of contracted installations works amounts to EUR 11,5 million.

Scope of Services
The scope of work included design&build for the following types of installations: electrical systems, water supply and sewage, heating, cooling, fire protection system, sprinkler, hydrants, low current systems (CCTV, access control, fire alarm, etc.), building management system, facade lighting as well as external mechanical and electrical installations.

Key Figures
Total area of the object: 51.000 m2
Transformer power: 4.800 kVA
Cable length: > 500.000 m
Smoke detectors: approx. 3.000 pcs
Ventilation capacity: 260.000m3/h
Cooling capacity: 3.600 kW
Heating capacity: 3.200 kW
Pipes installed (all systems) approx. 73.000 ml
Ventilation duct: 22.500 sqm

Highlights
High demands in terms of quality and the tight execution time that included fit-outs for BCR bank and IBM were a major challenge. LSG Romania  realized the project with a professional management team and thus ensured the construction of a new emblematic building that takes its place in a small group of exceptional buildings for Bucharest.

Completion
December, 2017.