The Project
City Colosseum has opened its door to its customers in Slavonski Brod, and thereby put its stamp to this part of Slavonia and  broader.

Scope of Work
LSG Company was contracted for designing and installation of the complete technical equipment  for this building, and has taken over an important role in this project.

Key Figures
Surface area:                                                  45,000m2
Quantity of thermally treated air:                  352,000m3/h
Capacity of heat conductive boiler room :         2,700 kW/h
Natural gas consumption:                                  290 m3/h
Electrical connection works:                                      5 MW
Cooling aggregate capacity:                               650  W/h
Capacity of evaporative cooling tower:              2,000 kW/h
Completion date:                                           April, 2013

Highlights
Please note that in this project the cooling system takes part through an evaporative cooling tower and heat pumps located in the premises of single shops, and the  heating takes place in the classical manner by means of boilers

 

The Client
Colosseum Gradski Centar Brod d.o.o., Slavonski Brod, Croatia

The Project
City Colosseum has opened its door to its customers in Slavonski Brod, and thereby put its stamp to this part of Slavonia and  broader.

Scope of Work
LSG Company was contracted for designing and installation of the complete technical equipment  for this building, and has taken over an important role in this project.

Key Figures
Surface area:                                                  45,000m2
Quantity of thermally treated air:                  352,000m3/h
Capacity of heat conductive boiler room :         2,700 kW/h
Natural gas consumption:                                  290 m3/h
Electrical connection works:                                      5 MW
Cooling aggregate capacity:                               650  W/h
Capacity of evaporative cooling tower:              2,000 kW/h
Completion date:                                           April, 2013

Highlights
Please note that in this project the cooling system takes part through an evaporative cooling tower and heat pumps located in the premises of single shops, and the  heating takes place in the classical manner by means of boilers

 