CLIENT
RaiffeisenEvolution Austria
PROJECT
The project, located in the most dynamic real estate development area in Romania, consists of 2 office buildings:
-FCC Sky Tower – the highest building in Romania (137 m height, 38 floors, approx. 75,000 sqm)
-FCC Office – building of 7 floors (approx. 25,000 sqm)
The project includes
We have been contracted by STRABAG – one of the largest European constructors – as General Contractor for installation works. The project included the design, execution and commissioning of the following installations: electrical systems and low current, ventilation, heating, cooling, fire protection, sanitary and BMS.
Figures
Total area (both buildings) – ca. 100,000 sq m
Electrical power: 12 MW
Cooling capacity: 5 MW
Heating capacity: 4 MW
High power busbartrunking: 1.5 km
Sprinklers: 10,000 pcs.
Cabling: 600 km
Generator: 2,000 kVA
UPS: 1,600 kVA
Cooling beams: 1350 pieces
Completion: December, 2013
Benchmarks
Following the recognition of our capacity to overcome challenges – STRABAG – awarded the contract to LSG.